Remove Form Remove Overall Equipment Effectiveness (OEE) Remove Pull Production
article thumbnail

Takt Time in Manufacturing

ATS

If goods are made faster than the customer wants them, the result is to build inventory, which is a form of waste in lean. When setting up a new production line: The cycle time of the bottleneck operation must be at least equal to the takt time. That’s of more value to management as a measure of machine, line or factory productivity.