article thumbnail

Signal relays handle 2 or 3 A in SPDT or DPDT contact forms

Design World

CUI Devices’ signal relays offer max switching currents of 2 A or 3 A in SPDT (1 Form C) or DPDT (2 Form C) contact forms. Boasting industry-best lead times, these low… The post Signal relays handle 2 or 3 A in SPDT or DPDT contact forms appeared first on Design World.

Form 189
article thumbnail

In Moldmaking, Mantle Process Addresses Lead Time and Talent Pool

Modern Machine Shop

But a very different means of making cores and cavities that has now fully come to market still uses a CNC machining center — albeit a modified one — and still works in tool steel — albeit initially in a non-solid form. The company’s process starts with steel in a paste form and is enabled by 3D printing.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FABTECH 2023 – 3D/Additive Manufacturing, Forming & Fabricating

Fabricating & Metal Work

3D/Additive Manufacturing, Forming & Fabricating Fabricating & Metalworking is proud to present the FABTECH 2023 Product Showcase, which is an invaluable guide to navigating the trade show floor at McCormick Place in Chicago this September. When assembled with mating forms, the pin is held securely in place by 360° contact.

article thumbnail

TJ Davies Manufactures Custom Machine Components and Retention Knobs with Industry Leading Lead-Times

Manufacturing Tomorrow

A fill-in-the-blanks form is provided at [link] to simplify the process. Typical lead time for custom retention knobs is 3-4 weeks.

article thumbnail

Thermoformer Cuts Cost, Lead Time Using 3D-Printed Molds

Plastics Today

Michigan-based thermoformer Duo Form collaborated with 3D Systems to integrate additive manufacturing into its production process.

article thumbnail

Emerson SolaHD Industrial Rack Mount On-Line UPS Improves User Interface and Lead Time

i4.0 today

The S4KD is an on-line (double conversion) UPS, providing a zero-transfer time from external to internal power upon utility power failure to deliver a seamless flow of power for critical loads. The S4KD is available in 1000-3000 VA in 120 V and 3000 VA in 230 V configurations, each housed in a slim 2U form factor. Today Magazine.

article thumbnail

Rail First celebrates 250th wagon manufacturing milestone

Manufacturer's Monthly

All Rail First wagons are manufactured within its Islington, SA facility on demand, with typical lead times of only 6 months. All Rail First wagons are manufactured within its Islington, SA facility on demand, with typical lead times of only 6 months.